200-300 TPH Gold Ore Crushing Plant in UAE

United Arab Emirates 200-300 TPH Gold Ore

1. Project Overview & Site Execution

Designed for a prominent gold mining project in the UAE, this 200-300TPH crushing line is engineered to prepare raw ore for maximum gold recovery. By utilizing the PE-900×1200 Jaw Crusher and the advanced HPT300 Multi-cylinder Hydraulic Cone Crusher, the plant efficiently reduces hard gold ore into fine aggregates (0-25mm). This "more crushing, less grinding" strategy significantly lowers the operational costs of the downstream ball milling process while maintaining stable high-capacity output.

LOCATION

United Arab Emirates

CAPACITY

200-300 TPH

MATERIAL

Gold Ore

PRODUCTS

0-10mm, 10-25mm (Prepared for Milling/Leaching)

200-300 TPH Gold Ore Crushing Plant in UAE

Project Site Snapshot & Execution Summary

Overview of the UAE gold mine crushing site, featuring the heavy-duty primary jaw station and the sophisticated HPT cone crusher hydraulic station.

"The HPT300 is a game-changer. It produces a very fine product size (mostly <15mm), which has increased our ball mill efficiency by 20%."

Ahmed Al-Mansoor, Project Director
**Figure 1:** Full site view and installation status of 200-300 TPH Gold Ore Crushing Plant in UAE.

2. Detailed Process Flow & Design Rationale

To optimize the downstream gold recovery process, we designed a two-stage crushing circuit focused on producing fine particles to reduce the workload of the ball mill:

  • Primary Crushing: Raw gold ore is fed into the PE-900×1200 Jaw Crusher via a vibrating feeder, reducing large rocks up to 750mm down to a manageable size.
  • Secondary Crushing: The material is conveyed to the HPT300 Multi-cylinder Hydraulic Cone Crusher. Its "lamination crushing" principle is highly effective for hard gold ore, producing a high percentage of fine aggregates.
  • Screening: An S5X-2460 Vibrating Screen separates the output.
    • >25mm: Returned to HPT300 for re-crushing (Closed Circuit).
    • 0-10mm & 10-25mm: Conveyed to the stockpile as final feed for the grinding or leaching stage.
Flow Chart of Gold Ore Crushing and Screening Process
Figure 2: Flow Chart of Gold Ore Crushing and Screening Process

4. Project Highlights & Value Creation

Optimized for Milling

The HPT cone crusher produces finer output (<10mm), significantly reducing the energy consumption of the subsequent ball mill.

Intelligent Control

Features a fully automated hydraulic and lubrication control system for safe 24/7 operation in high temperatures.

Heavy Duty Design

Engineered to withstand the extreme abrasion of gold ore and the harsh desert environment of the UAE.

READY TO START YOUR PROJECT?

View similar successful cases or contact us directly for a free project assessment.

GET FREE CONSULTATION

More Related Gold Ore Projects

Search for products, cases, or solutions.